Posts Tagged MacGyver

Embrace Ugly

As best as I can recall, I’ve never coined a phrase with any staying power.

Until now.

And, my phrase has been purposely captured on a T-shirt, by someone other than a close relative. It’s not quite like having my words recorded indelibly in marble and situated in the Parthenon, but I’ll take it.

Enough gloating, what’s the phrase and what is its etymology?

“Embrace ugly.”

It’s a term that I have used frequently with a particular client. Frequently – as in multiple times per day, even multiple times per hour. I repeated the phrase, not only because of its self-entertainment value (yes, I do that), but more importantly to break the client’s paradigm.

You see, they were (note the past tense) chronic and debilitating perfectionists.

Now, striving for perfection is part and parcel of Lean Thinking (by way of Womack and Jones). The Lean Enterprise Institute lists the fifth step, “As value is specified, value streams are identified, wasted steps are removed, and flow and pull are introduced, begin the process again and continue it until a state of perfection is reached in which perfect value is created with no waste.”

However, the intent is to aggressively pursue continuous improvement – by frequently and rigorously spinning the PDCA (plan-do-check-act) wheel.

Perfectionists however have a very difficult time getting around the wheel and, in essence, missing the benefits of failing faster. Perfectionists tend to have their own version of the wheel, something like PPPPPDDDDD, or Plaaaaaaannnnnn, then Dooooooooooo. “C” and “A” are, often accidentally and ironically excluded from the perfectionists wheel.

Why?

Because after investing so much time planning and then investing in the perfect “Do,” (impossible, by the way) there is little time or money or will left to make meaningful adjustments. The victims (a.k.a. stakeholders) are often doomed to a life with less than optimal fixtures, equipment, facilities, etc.

How many times have you seen expensive underutilized stainless steel equipment, nicely laminated work surfaces that workers do not like, pricey, oversized extruded aluminum workstations, and flashy, but useless tooling? Stuff that unfortunately was not designed or developed with important things in mind like takt time, footprint, PM’s, flows (of people, materials, supplies, information, tooling, etc.), visual control and line of sight (i.e., can you see over and around it easily?), ergonomics, scrap, etc.

While lean folks apply 3P (production preparation process) concepts like 7 different ways and seek to down-select to the top three or so and then trystorm their way into the best using sub-scale and full scale models made of cardboard, plywood, and PVC, perfectionists are machining or building the perfect design in expensive materials.

In short, lean folks embrace ugly. They revel in trystorming, in learning, in rapid PDCA. Ugly is synonymous with the quick and the dirty.

Which is exactly why I kept repeating, “embrace ugly,” until my friends were repeating the same and then finally breaking away from the suffocating, expensive, lethargic legacy of perfectionism.

…and now, they’re wearing the words on their shirts.

A couple of quotes:

“Quick and dirty is better than slow and fancy.” – Taiichi Ohno

“A good plan implemented today is better than a perfect plan implemented at some unspecified

time in the future.” – General George S. Patton

Related posts: Kaizen Principle: Be Like MacGyver, Use Creativity Before Capital!, Lean Space – Some Thoughts and 10 Questions

Tags: , ,

Kaizen Principle: Bias for Action

Several days ago, during a health care value stream analysis, I was impressed with the team’s bias for action. Now we know that value stream mapping is typically a “paper” activity, but it was refreshing to see that one of the future state’s kaizen bursts, identified as a “just-do-it,” couldn’t wait. The team completed the just-do-it right before the wrap-up presentation. Outstanding!

Kaizen is founded on certain principles, one of which is a bias for action. This bias for action is largely a behavioral thing, but it can be facilitated by effective coaching, formal training, and the application of lean management systems and related visual controls that should absolutely scream for action.

Of course, it’s worth mentioning my “short list” of kaizen principles (see the Kaizen Event Fieldbook), because I think we need to have a holistic perspective and because together they should drive the right kind of bias for action. I call this my 10 + 1 list. I’m pretty sure that other lean practitioners can make some  great arguments for a few more, but I wanted to keep the list relatively short.

  1. Think PDCA and SDCA, the basic scientific methods.
  2. Go to the gemba; observe and document reality.
  3. Ask “why?” five times to identify root causes.
  4. Be dissatisfied with the status quo.
  5. Kaizen what matters.
  6. Have a bias for action.
  7. Frequent, small incremental improvements drive big, sustainable improvements.
  8. Be like MacGyver; use creativity before capital.
  9. Kaizen is everyone’s job.
  10. No transformation without transformation leadership.

Plus – Do everything with humility and respect for the individual.

The combined dissatisfaction with the status quo (eyes for waste  “see” the current state and the ideal state) and the existence of explicit performance gaps that are targeted for closure (kaizen what matters) should be unbearable enough to drive action. And, our action should be focused on appropriately and economically (MacGyver was a creative cheapskate) addressing the root causes (5 why’s and PDCA thinking) and then sustaining the performance (SDCA).

So, I’ll leave you with another bias for action story, surprisingly also within a value stream analysis backdrop. Tony, the plant manager, was participating in a combined value stream analysis/plant lay-out/3P activity for a brand new line. As we developed pro forma standard work and were doing table top and plant floor simulations applying, among other things continuous flow, he had a eureka moment. Actually, I noticed that he was becoming quite agitated and then…he disappeared. Over an hour later, Tony returned. He informed the team that he couldn’t stand it when he realized that the same principles needed to be applied to existing lines. So, right away, he made sure that the other lines (granted, without standard work at the time) stop their evil batch and queue ways and go to single piece flow. By the next day, the old lines had demonstrated an 18% productivity improvement (and yes, this was sustained). Now, that’s bias for action!

Related posts: Ready! Fire! Aim!…Maybe, We Should Have REALLY Simulated First!?, Kaizen Principle: Be Like MacGyver, Use Creativity before Capital!

Tags: , , , , ,

Kaizen Principle: Be like MacGyver, use creativity before capital!

MacGyver picRemember Angus MacGyver? He was the star of the old MacGyver TV series and used science and the inventive application of common items (gum wrappers, duct tape, etc. – kind of a one person moonshine shop) to solve desperate problems. Well, MacGyver should be an unofficial kaizen hero for his real-time creativity and frugality.

Are we saying that lean practitioners are cheap? Well, yes from the standpoint that it is muda to spend or use more than is required to implement an effective countermeasure. But, the real driver behind the principle here is trystorming (the dynamic, real-time cycle of try-observe-improve-repeat through which individuals and teams identify and validate the best improvement idea) as much as possible before, if need be, committing some real capital. As Taiichi Ohno was credited with saying, “Quick and dirty is better than slow and fancy.”

And with the notion of “dirty” there is need for kaizeners to get their hands dirty – planning, doing, checking and adjusting. This requires the use of often simple, readily available materials (wood, cardboard, PVC, etc.) and “re-purposed” equipment, furniture, materials and supplies. So, what are some examples where people effectively reached for their brains before their wallets:

  • Re-purposed discarded rooftop air conditioner attached to a cooling vessel increased the compounding line rate ($0.9 million annual savings),
  • Urinal flush valve used to quickly dispense the requisite amount of water to a dry material so that it could be safely shipped,
  • Residential dishwasher serving as a right-sized, line-side parts washer.

So, what are some of your favorite MacGyver moments?