Archive for category Lean Management System

Plan Vs. Actual – The Swiss Army Knife of Charts

swiss army knifeImagine that you were only allowed one chart (or board) at the gemba. What would you pick? What is the Swiss Army knife (I’m more of a Leatherman Multitool fan myself) of charts that gives you insight into process adherence and process performance?

For me, it’s the plan vs. actual chart – also known as the production analysis board (or chart), day-by-the-hour chart, etc. It is typically a paper chart (my preference) or dry erase board that is positioned at the pacemaker process. It’s refreshingly low-tech and reflects, at a minimum, the line, cell or team name, output requirements (number of picks, assemblies, invoices, etc.) for the day or shift, the related takt time, the planned hourly (or smaller time increment) and cumulative outputs for the day or shift, the actual hourly and cumulative outputs (or in some practices the cumulative deficit or surplus) and fields to record the problem or reason for any hourly plan vs. actual deltas as well as a sign-off by lean leader(s) as proof of review.

So, why is the plan vs. actual so powerful? Here’s 5 reasons.

  1. Communicates customer requirements. The chart reflects the demand, by type or product, quantity, and timing and sequence. It reflects a takt image.
  2. Forces the matching of cycle time to takt time. Standard work should dictate the requisite staffing (and related cycle time, work sequence and standard WIP) to satisfy the customer requirements.
  3. Engages the employee and drives problem-solving. Like any visual control worth its salt, the plan vs. actual is worker-managed in a relatively real-time way. It highlights abnormal conditions (hourly and/or cumulative shortfalls or overproduction) and drives self-correction or at least notification/escalation and containment. The plan vs. actual also spurs PDCA in that the worker is required to identify the root cause of the abnormal condition and ultimately points the worker, team and leadership to effective countermeasures.
  4. Focuses lean leaders within the context of leader standard work. A good plan vs. actual will have fields for team leader/supervisor sign-offs on the hour and managers twice daily. This is essentially proof of the execution of leader standard work in which the leader should ensure that the plan vs. actual is maintained real-time, is complete (i.e., no unexplained abnormalities), and that countermeasures are being employed in order to effectively satisfy customer requirements.
  5. Focuses associates and lean leaders within the context of the daily accountability process. The prior day’s plan vs. actual and trended performance (including pitch logs) should be reviewed within daily tiered meetings. These meetings help drive the identification of improvement opportunities and countermeasures at the individual, team and value stream level.

So, what’s your Swiss Army Knife chart and why?

Related posts: Leader Standard Work Should Be…Work!, Leader Standard Work – You can pay me now, or you can pay me later

Share

Tags: , , , , , , ,

Leader Standard Work Should Be…Work!

leader standard work is work picThis may be a blinding flash of the obvious, but while leaders typically work hard, it’s a different type of work. Most leaders are engaged in a lot of firefighting. We need less of that and more work on ensuring process adherence and performance with more coaching and development. That’s where lean management systems, of which leader standard work is a major element, come into play.

The interesting thing is that leaders don’t necessarily like to do leader standard work. Implementing can be like pulling teeth. Why? Well, it requires a change in behavior, there is more rigor (when compared to the lots of meetings and fire fighting work style), there is a new level of transparency and accountability and there is the need to engage, coach, and sometimes confront others. Let’s explore these things a bit.

Rigor

Most leaders have no problem with other people doing standard work. However, often their tune changes when it’s required of them.

Leader standard work specifies audit points and (sometimes) tasks. The audit points specify where and when in the value stream the leader must physically go, what they must check and the normal condition that they seek to verify with the aid of effective visual controls. This is a major part of their standardize-do-check-act (SDCA) role. The time spent executing leader standard work varies depending upon the leader’s  level and role within the organization. For example, a supervisor may dedicate as much as 50+%  of their day on leader standard work, while a value stream manager may spend 15% of their day.

A lean leader’s standard work, among other things, may require him to check a particular work cell once in the morning and once in the afternoon to ensure that the workers are maintaining their plan vs. actual chart (usually by hour),  and that specific and meaningful reasons for any shortfalls are documented. The lean leader may also be required to initial and write the time of their review on the chart as proof that they conducted this part of their leader standard work.

Transparency and Accountability

As in any lean environment, secrets are a bad thing. We want to be problem solvers, not problem hiders.

At the conclusion of a lean leader’s day (by a specified time), the leader should be required to insert their completed leader standard work form within a designated clear bin or sleeve posted in a prominent place. Their name and leader standard work deadline should be on the bin along with a red flag (or something suitably obnoxious) behind the bin, so that it is quite obvious who has met the deadline and who has not.

Similarly, on a daily basis, the next level leader should peruse the submitted leader standard work for completion, identified abnormal conditions and sufficiency of recorded countermeasures to address the abnormal conditions. The next level leader would do well to note certain things, for example patterns of incomplete audits, recurring abnormal conditions (guess we’re not getting at the root cause), lack of abnormal conditions (are we really being rigorous in our audits?), etc. and then coach their subordinates as required. Coaching can often be done in the context of one-on-one gemba walks.

Engagement, Coaching, and Confrontation

Guess what? If the application of the leader standard work requires us to go the gemba and make direct observations specific to conditions around process adherence and process performance, then there are going to be plenty of opportunities for genuine investigation, coaching and sometimes confrontation.

We always want to live the lean principle of respect for the individual. That is why when we encounter an abnormal condition we should ask why (5X). Our countermeasures and coaching should follow suit -  a worker’s lack of process performance due to a shortfall in training is handled much differently than if it is due to a decided case of worker apathy.

It sounds like a lot of work, but this powerful means of SDCA is worth it! What’s your experience been implementing leader standard work?

Related posts: Stretch, Don’t Break – 5 ways to grow your people, Leader Standard Work – You can pay me now, or you can pay me later

Share

Tags: , , ,

Subsidiarity: A (Medieval) Lean Principle

Subsidiarity picRon Pereira has been gracious enough to allow me to guest blog on his LSS Academy blog. I hope  that you find my post on subsidiarity (yes, there really is a lean connection) of value and take the opportunity to check out LSS Academy’s great insights and offerings.

Share

Tags: , , , , , ,

Leader Standard Work – You Can Pay Me Now, or You Can Pay Me Later

mechanicDuring the 1970’s and 1980’s, Fram oil filters used to run TV ads that featured a mechanic with a rather dour look on his face. Ostensibly, he had just seen something really bad under some poor sap’s car hood, the root cause being a lack of preventive maintenance – specifically someone had not changed their oil filter within the last millennium or so. He then uttered the warning to the viewer, “You can pay me now or you can pay me later.” Chilling.

Well, the same warning is relevant to the application of leader standard work. Leader standard work is one of the four major lean management system elements, the others being: visual controls, a daily accountability system, and leadership discipline. Leader standard work is a simple but powerful standardize-do-check-act (SDCA) way to lock in kaizen gains and to ensure process adherence as well as process performance. Leaders apply the frequent rigor of gemba-based leader standard work audits, as aided by “drive by” visual controls, to quickly determine if situations are normal or abnormal and, if abnormal, ascertain the root cause(s) and then deploy necessary countermeasures. It drives a required discipline at multiple leadership levels and ultimately facilitates a lean culture.

leader std work pic

Where’s the warning in this? Typically new standard work is developed, tested and implemented as part of a kaizen event or activity. This is part of the PDCA improvement cycle. However, sustainability is always a challenge – for a variety of reasons. Perhaps the standard work did not anticipate certain product or service variations, maybe the supporting material flow design is imperfect, possibly the associates were not adequately trained in the new standard work, heck, maybe the associates just don’t want any part of the standard work and the related transparency and accountability, etc., etc. Well, standard work does not do any good if it is not sufficient and/or not followed. Hence the need for SDCA activity. Leader standard work “forces” leaders to practice SDCA. Human nature is such that people rather not check on process adherence because often, especially in an immature lean environment, there is a good chance that people won’t always willingly follow the standard work…and then what? This requires intervention and sometimes confrontation (remember, attack the process, not the person – 5 Why’s before the 5 Who’s). The longer process adherence is left unchecked, the less the likelihood of kaizen sustainability (hey, this lean stuff doesn’t work!) and the more powerful the change antibodies will become.

So, you can pay me now, by cumulatively implementing leader standard work with each new addition/modification to standard work or you can pay me later, after much pain, suffering and backsliding and finally get serious enough to implement some “catch up” leader standard work.

What are your experiences with leader standard work implementation?

Related posts: Leader Standard Work Should Be…Work!, Leader Standard Work – Chock that PDCA Wheel

Share

Tags: , ,